• Home
  • News
  • Hydraulic fracturing Community Bulletin #32

Hydraulic fracturing Community Bulletin #32

09 Jul 2020 12:35 PM | Sonia Harvey (Administrator)

Independent Oversight of Hydraulic Fracturing Implementation

A key part of the Government’s response to the Inquiry and the Implementation Plan is building trust through transparency. The principles of engagement, transparency and accountability are guiding our approach to implementing the recommendations.

Current mechanisms for independent oversight include:

Independent Overseer

A key mechanism of oversight is the Independent Overseer, Dr David Ritchie.

The role of the Independent Overseer is to provide the Chief Minister and NT Government with independent advice on how the implementation of the recommendations from the Inquiry is progressing and being managed.

Dr David Ritchie’s role as Independent Overseer was due to expire on 30 June 2020, an extension has been granted until 31 December 2021.

The Onshore Shale Gas Community and Business Reference Group


The Onshore Shale Gas Community and Business Reference Group (CBRG) provides direct feedback and advice to the Hydraulic Fracturing Inquiry Implementation, coordinated by the Department of the Chief Minister.

The CBRG is essential to ensure stakeholders have oversight and input into the development of the implementation framework and its subsequent execution.

The CBRG’s term was due to conclude in June 2020.

The CBRG’s term has been extended until 31 December 2020 and continue their oversight of Stage 3 implementation.

Other targeted oversight

The Aboriginal Information Program Working Group has been established to guide the implementation of Recommendations 11.5 and 11.6 and includes representatives from Land Councils, Aboriginal Areas Protection Authority (AAPA) and the Australian Petroleum Production and Exploration Association (APPEA).

The Aboriginal Information Program is being designed with CSIRO to ensure Aboriginal people and communities have access to consistent, factual, relevant and easy to understand and culturally appropriate information relating to the onshore petroleum industry.

A Regional Reference Group will established for the Strategic Regional and Environmental Baseline Assessment (SREBA) in the Beetaloo Sub-Basin. 

The Reference Group will comprise stakeholders who live, or have interests within the SREBA region to ensure there is appropriate local and regional engagement in baseline studies and SREBA outcomes.

The Reference Group will provide advice on the development and implementation of the SREBA studies within the region, engagement with local stakeholders, and communication of results and outcomes to the community.

 


Comments

  • 15 Sep 2021 12:17 AM | side effects of furosemide
    Buy Oristat
    Link  •  Reply
  • 17 Sep 2021 10:55 AM | Plaquenil
    Bentyl Antispas
    Link  •  Reply
  • 01 Oct 2021 12:23 AM | Neurontine
    No Script Lasix
    Link  •  Reply
  • 01 Nov 2021 11:24 PM | propecia generic name
    Sintomas Del Propecia
    Link  •  Reply
  • 10 Nov 2021 10:20 PM | Lasix
    Propecia Weight Training
    Link  •  Reply
  • 14 Nov 2021 8:12 PM | Prednisone
    Order Kamagra
    Link  •  Reply
  • 04 Dec 2021 3:49 PM | azithromycin for sinus infection
    Buy Silagra Online In India
    Link  •  Reply
  • 07 Dec 2021 2:58 AM | hydroxychloroquine buy
    Is Disulfiram Approved In Canada
    Link  •  Reply
  • 08 Dec 2021 12:47 PM | gabapentin dosage for sleep
    Acheter Tadalis Sx 10 Mg
    Link  •  Reply
  • 11 Dec 2021 12:27 AM | 215 yellow capsule
    Canadian Drugs
    Link  •  Reply
  • 20 Dec 2021 11:33 AM | order zithromax
    Kamagra Gold Review
    Link  •  Reply
  • 21 Dec 2021 12:55 AM | finasteride without prescription uk
    Buy Albendazole Online
    Link  •  Reply

Energy Club NT is an Incorporated Association 

The information contained in this website is for general information purposes only. The information is provided by Energy Club NT Inc and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.

In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.

Through this website you are able to link to other websites and files which may not be owned, authored or under the control of Energy Club NT Inc. We have no control over the nature, content and availability of other websites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.

Powered by Wild Apricot Membership Software